Why you need a business sign permit
A business sign permit is the city's way of checking that a new sign is safe, properly attached and allowed where you want it. Local sign codes typically control size, height, placement, lighting and how far a sign projects from the building. Because a sign hangs over sidewalks and parking lots, the city also wants to know that it is mounted and wired correctly.
Most cities require a sign permit for exterior signs, and many shopping centers require landlord approval. We provide the drawings and specification sheets permit offices usually request.
Every city writes its own rules, so treat this guide as an overview. Your local building or planning department has the final word on what is required for your address.
Which signs usually need permits for signage
Requirements differ, but these are the situations where a permit is most commonly required:
- Exterior wall signs, including channel letters, halo-lit letters and illuminated logos.
- Illuminated signs of any kind, which may need an electrical permit in addition to the sign permit.
- Non-illuminated exterior signs, such as dimensional letters on a storefront, in many cities.
- Projecting, hanging and freestanding signs.
- Replacement signs, even when the new sign goes in the same spot as the old one.
What a sign permit application typically includes
The exact forms vary, but most permit offices ask for some version of the following:
- Sign drawings showing the design, colors and overall dimensions.
- A site or elevation drawing showing where the sign will go on the building, often with the wall or frontage width.
- Sign area calculations, since many codes limit total sign area based on your frontage.
- Mounting details, describing how the sign attaches to the wall.
- Electrical details for illuminated signs, such as the power supply and how the sign is connected.
- Landlord or property owner approval, if you lease your space.
- Contractor information for the installer or electrician doing the work.
Shopping center and landlord sign criteria
If you lease space in a shopping center, office park or mixed-use building, there is usually a second set of rules on top of the city's: the landlord's sign criteria. These are often in your lease or a separate tenant sign package. They can specify sign type, letter height, maximum sign area, colors, illumination, mounting method, and whether letters must sit on a raceway.
Landlords usually want to review and sign off on your drawings before you submit to the city, and many cities expect to see that approval with the application. Get your criteria early and design to them from the start. It is much easier than revising a sign after it has been rejected.
Typical steps and who does what
Here is how a store sign permit usually comes together when you order from IntelliSign:
- You share your artwork, wall photo, measurements and any landlord sign criteria.
- We prepare a design proof and, once the design is set, the drawings and specification sheets for your submittals.
- You submit the drawings to your landlord for approval, if required.
- You or your installer apply to the city for the sign permit, and an electrician pulls any electrical permit needed.
- The city reviews the application and may ask for changes or more information.
- After approval, your installer mounts the sign and a licensed electrician connects it. Some cities inspect the finished work.
Timing your permit with production
Permit review times vary widely by city, so start early. A good approach is to settle your design, get your drawings, and begin landlord and city review before or while your sign is being made. Production typically takes 10–15 business days after design approval and deposit, and shipping takes 5–10 business days after final approval and balance payment. If your permit is still pending when the sign arrives, store it safely in its packaging until you have approval to install.
Ask your permit office what it expects for illuminated signs. Some want details of the electrical components in the sign. Your spec sheet lists the components in your sign, and you can request any specific documentation before you approve your order.
Illuminated sign permit considerations
An illuminated sign permit often involves more than the sign review itself. Because lit signs connect to your building's electrical system, many cities route them through electrical review as well. The electrician who connects the sign usually handles the electrical permit, and some jurisdictions inspect the connection before the sign can be switched on.
Lighting rules can also shape the design. Some cities and shopping centers limit brightness, set hours of operation, restrict certain colors or animated effects, or prefer halo-lit and front-lit letters over light boxes. If your sign will face homes, expect closer attention to glare and brightness. Raise these questions before you finalize your design so the proof reflects what your city and landlord will accept.
Common reasons permits get delayed
Many permit delays come down to missing or inconsistent information. Watch out for these:
- Drawings that do not show the sign's overall dimensions or its position on the building.
- Sign area that exceeds what the code allows for your frontage.
- No landlord or property owner approval attached.
- Missing mounting or electrical details for an illuminated sign.
- Changes to the design after submission that do not match the approved drawings.
Who to call with questions
For code questions, call your city's building or planning department; many publish their sign code online. For lease requirements, ask your landlord or property manager for the sign criteria. Your installer is also a good resource, since local installers often know the permit process in your area. We can recommend independent local installers on request. Installers are independent businesses and are paid directly by you.